The electricity future | Guernsey Electricity
  • Pay Online
    • Billing
    • Vulnerable Customers
    • Moving House
    • Switch to E billing
    • Ways to Pay
    • Pay as you go
    • Submit a Meter Reading
    ALF or New Connection
  • New Tariffs
    Talking Tariffs
    Switching Time Bands
  • Electric Heating
    • Important - what you need to know first
    • Air source heat pumps
    • Boilers
    • Electric Panels and Radiators
    • Heated towel rails
    • Storage heaters
    • Underfloor heating
    • Water heating
    • Cost to run
    Electric Alternatives
    • Electric Charging Points
    • Renewables
    • Battery Storage
    Electrical Services
    • Home Energy Saving Audit
    • Electricians
    • Plumbers
    • Network Services
  • Powering Life For Less
  • Company Information
    Careers
    • Office
    • Trades
    • Engineering
    Supply
    • Where our electricity comes from
    • Importing electricity
    • Community Solar
    • The electricity future
    • Off-Peak Storage
    Strategy
    • Delivering the Energy Transition
    • Interconnectors
    • Investment
    • Network, Demand & Supply
    • Renewables for all
    Sustainability
    • Carbon Reporting
    • Community Projects
    • Off-Peak Usage
    • PEH Project
    News & Blog
  • Help & FAQs
    • Help
    • Moving House
    • Pay Online
    • Meter Reading
    • Contact Us
    TOPICS
    • Heating
    • My Account
    • Emergencies
    • Payments & Billing
    • Sustainable
    • GEL Services
  • Shop
  • Contact
net zero carbon

The electric future

The States of Guernsey have pledged to reach net-zero by 2050. Where our energy comes from and how we use it will play a leading role in achieving this goal. 

We have made great progress, but to maintain the momentum towards net zero, we need to act fast to provide the best possible solutions to suit our island’s needs. 

  • Solar

    Whilst one of the more advanced technologies, the intermittent nature of solar energy (only generates in the day) limits the reliability. On very sunny days, Guernsey would generate too much, so we would need batteries or to ability to export via a subsea cable.   

     

    To provide 70 Megawatt (MW) of electricity from solar, 175,000 solar panels are required and each MW requires about 2.5 acres of space. 

  • Wind

    Wind energy is commercially viable, and research has shown a promising local resource for an offshore development.  Consideration would be needed around impacts to the environment, fisheries and shipping for example.  The fluctuation in wind would require battery storage or a second subsea cable to export energy.  

  • Wave

    Technology is still developing, and waves are an unreliable and unpredictable energy source. 
    Research has identified three potential locations but there are no technologies which are at a commercial scale. 

  • Tidal

    Tidal energy is predictable, and we have one of the largest tidal ranges in the world which could be harnessed via tidal stream, barrage or lagoon. The local potential has been investigated but there are limited installation sites. It is expensive, there are environmental impacts and the power produced does not always match up with energy demand. Battery storage or a second subsea cable would be needed for when supply exceeds demand. 

  • Fossil fuel power station

    Generating from the power station is dependable, but significant upgrades are required imminently. As one of the most carbon emitting sources, it brings significant financial and environmental costs, threatening our ability to meet net zero.  

  • Second subsea cable

    A 100MW cable would provide enough electricity for the island and allow for the decabonisation of heating and transport in Guernsey, meaning the power station would no longer be required. 

    It would also provide the security to enable more local renewables and the ability to export and sell any excess energy. 

carbon

We've come so far

We used to rely entirely on our fossil-fuelled power station, but now the subsea is now our primary source of electricity.  This has delivered a 37.5% decrease in Guernsey's emissions from 1990 levels. But we still have some way to go before Guernsey is net zero. 

Our subsea cable provides up to 60MW of electricity to the island. When demand exceeds this, we make up the difference by using the fossil fuelled power station. This comes with environmental and financial costs. 

Demand is predicted to increase. Phasing out petrol vehicles and fossil fuel heating, means the phasing in of electric-powered alternatives. At the moment, this would mean using the power station more. A decision needs to be made on how we provide this additional electricity. 

No decision is a decision to use fossil fuels. 

Electricity in Guernsey
Storing energy
Batteries can store energy for when the sun isn’t shining or supply exceeds demand.

The scale required to give security of supply for our Island is large and costly. For example, in the Winter, it would take around 10 days to recharge the batteries using solar and these would only provide enough electricity for 24 hours. 

Battery Storage
Energy sources
Buying renewable energy certificates for the energy we import doesn’t mean we are getting renewables through the cable.

 ‘Guarantee of Origin’ certificates (GoO’s) are the current market mechanism for driving investment in renewables. We are using our market power to drive investment to the right places. By increasing the demand for renewable and sustainable electricity, we reduce the investment into fossil fuels. The more communities that make this same choice, creating more demand for energy from sustainable energy sources, the more generators will invest in these technologies. 

Watch Video

Local renewables alone cannot provide the electricity we need today, let alone in the future. 

 

Using a mix of sources will offer reliability and security.

This isn't a choice between subsea cable or local renewables.
Studies and Reports
  • Energy analysis & strategy recommendations
    University of Exeter in co-operation with the Guernsey Renewable Energy Team
    Final report
  • The Island's Energy Policy
    Outlining the vision for Guernsey’s energy future and prioritising opportunities to reduce emissions.
    Read the States of Guernsey Energy Policy 2020-2050
  • Renewable Energy Strategy
    A States of Guernsey report
    Renewable Energy Strategy 2017 Onwards
  • Energy demand forecast
    A report commissioned to forecast energy demand on the Island of Guernsey out to 2050.
    Energy Demand Forecast
  • Offshore Wind
    A study that investigated renewable energy development in Guernsey, focusing on offshore wind and tidal energy
    Offshore Wind Preliminary Feasibility Report
  • Offshore wind and tidal energy in Guernsey
    An Exeter University study that investigated public acceptability of renewable energy development in Guernsey, focusing on offshore wind and tidal energy
    Summary Report

Powering life today and tomorrow

Local renewables alone cannot provide the electricity we need today, let alone in the future.  Using a mix of sources will offer reliability and security. This isn't a choice between subsea cable or local renewables.

Will we still need the power station in the future?

The import cable alone does not meet the islands electricity needs when energy demand is at its greatest. The GJ1 cable can provide 100% of Guernsey’s energy needs in summer and around 75% in winter, so the power station is still required as both a top-up for the winter peak periods and as a back-up when the GJ1 interconnector requires to be switched off for maintenance.

Guernsey Electricity’s long-term strategy is for an energy system that supports renewables and reduces the reliance on fossil fuels to use the power station for emergency generation only.

This second cable would mean that the power station will no longer need to ‘top-up’ supplies and will act purely as a ‘back-up’ for emergencies.

We have the largest tidal range in the world, why aren’t we focusing on tidal power?

This is becoming commercially viable, but at the moment it is not affordable for the island. The potential for exploiting Guernsey’s tidal range was investigated at Cobo Bay,  Havelet Bay, Victoria and Beaucette marinas but the outputs and generation were initially too small to justify further investigation. 

Are the streetlights LEDs and when do they come on?

Over 80% of our streetlights are now LED or use energy efficient bulbs. Our systems automatically turn the lighting on and off at dusk and dawn in busy areas such as St Peter Port and main road junctions. Where safe to do so, lamps are turned off at midnight or 1am to save energy. 

Smart street lighting systems are becoming more common around the world and we are keeping a close eye on developments to see if this technology could be used in Guernsey. 

Subscribe

To report an emergency: Freephone 0800 5870285

Company Registration 38692
  • Facebook
    Facebook
  • Twitter
    Twitter
  • Instagram
    Instagram
  • LinkedIn
    LinkedIn
  • Privacy
  • Legal
  • Careers
  • Contact Us
ELECTRA